What to Discuss Before Writing a Maryland Land Offer

Real estate contract illustration

What I cover in this video

In the video, I walk through a sample raw-land purchase in two stages. First, I’d use a feasibility period to check utilities or septic, take the floor plan to the site with the builder, surveyor and engineer, and get a clearer idea of where the house fits and what the work could cost. I’d also decide which tests the team needs before I commit.

Watch the video

Write the investigation into the offer

For raw land, start with the questions that would change your decision to buy. In my example, I want a particular house in a particular location. Have your agent or attorney review the agreement for testing access, costs, deadlines and the steps to take if the proposed location doesn’t work. Get permission for intrusive work before scheduling it.

Bring the floor plan to the site

Hand the same drawing to the builder, engineer and surveyor. Walk to the proposed front door together. The builder can consider equipment access, the surveyor can identify what needs locating, and the engineer can look at grading and drainage. Ask each for a price based on that location so you can compare the findings on one budget. Calvert County residential permitting process.

Let utility and soil questions set the calendar

Public sewer availability and private septic suitability lead to different investigations. If the property needs a perc evaluation, check with Environmental Health on the existing file and eligibility for testing. Wet-season scheduling can depend on groundwater conditions. The month mentioned in my recording is an example from that project, not a date to write into a new offer. Calvert County perc test guidance.

Separate permit timing from feasibility timing

Once the preliminary layout works, find out which agencies must review the permit package. A project involving grading, a sensitive area or private wastewater can need additional documents. Ask the county which reviews apply and your engineer what must be ready to submit. Use those answers when discussing a permit deadline in the contract. Calvert County residential application checklist.

Put fees and draws on the same calendar

An engineering installment, a county fee and a builder’s draw may all come due on different days. Ask for current written fee schedules, any available payment options and the lender’s draw procedure. That tells you how much cash you need before reimbursement and avoids treating the fee arrangement in my recording as a promise for another parcel. CFPB construction loan overview.

Plan your investigation before you write the offer

Imagine the land works for you only if the house can sit near a particular stand of trees. Tell your agent and attorney that before you write. Ask the engineer what information would establish whether that location works and how long it would take to obtain it.

Budget for the investigation itself. Ask who will arrange and pay for testing, whether the seller’s permission covers the proposed work, and who restores disturbed ground. Discuss what the agreement allows if a test can’t be completed before the deadline.

Read the video transcript

Transcript from the original recording, with light edits for readability.

0:00 So you found your land, and you want to start building your custom home. Me, it's going to be a barndominium, and we all know that. Where do you start now? Well, for the sake of these videos, I have found raw land. So I'm not going to purchase this property until I know I can do exactly what I want to do with it. I want to build a house of my choice and the location of my choice. The way to do that is with some feasibility studies and different contingencies in the contract that I'm going to write. My first timeline is going to be a simple feasibility study. And during that feasibility study, I need to find out if it needs to be perced or if there's public water and sewer.

0:38 If it needs a perc test, I know it's going to take a little while in my county because it's June and our perc season is not until December. During this feasibility study, I'm going to take my floor plans. I'm going to give them to my builder and I'm going to tell him to go and meet me out at the lot. I'm also going to give those plans to the surveyor and the engineer. Because once I've given the plans to those two team members, we're going to discuss exactly where I see my house being built and they can give me their ideas. During that feasibility study, they're also going to give me their prices. During this feasibility study, I can do any of the tests that I want to do.

1:16 So let's say environmental testing, I can also drill well, test the soil, things like that. So once I'm happy with everything, I'm happy with the numbers, I'm happy with the location, then we can start moving on to the permit contingency. The length of a feasibility study really depends on each particular situation and can vary. Permit times are going to vary too, depending on wetlands, streams, forest conservation, water management, if there's a septic. Now in my county, it's going to take anywhere between two months to four months to get it through all the different departments to get approved.

1:53 Once it's approved, I will have to pay what they call, it's a permit fee, but we call it an impact fee. I paid for the first third of that once I applied for my permits. To pick up the final permit, I actually have to either pay that whole fee off or I can defer mine over two different tax seasons. So I found the fees that cost the most money during this permit process will be to the county for the impact fees, which I can defer, because I asked, and then also to the land surveyor engineer, but I also can pay him in different installments.

2:32 I'm also working with a construction perm loan, so my builder can also get different draws and get paid. Let me know if you have any questions. Cheers.

Frequently asked questions

Official sources

See all videos in the custom home series