Before You Buy Land in Maryland, Check the Sewer or Septic

Septic site evaluation illustration

What I cover in this video

My first call on a raw lot is to find out whether the exact parcel can connect to public water or sewer. If it can, ask about the permit, connection cost and any existing or proposed charges. If the lot needs private septic, call Environmental Health and ask what records exist and what testing the county would require for your project.

Watch the video

Confirm public service for the exact parcel

Start with the address or tax parcel number. Ask who serves it, whether public sewer and water are available separately, and where each connection would be made. A house across the street can have service while your lot still needs an extension or a new connection permit. Calvert County publishes its process for new connections. Calvert County water and sewer connection permits.

Understand the connection bill

Ask the utility for the price to connect and the seller for documents describing any existing deferred water or sewer charges. A tap charge due now and an annual charge collected over time affect your budget differently. Have the title company identify the payee, remaining term and treatment at settlement before assuming a future buyer takes over.

What the perc test measures

A perc test measures how water moves into the soil at a test location. In Calvert, Environmental Health evaluates suitability for on-site sewage disposal. Ask for the actual parcel file and which area was evaluated. Then ask how the results relate to the bedroom count, system design and space you plan to use for the house. Calvert County perc test guidance.

Why timing matters to a seller as well as a buyer

If wet-season testing applies, an offer can reach its decision deadline before testing is available. Calvert’s Health Department monitors water-table conditions and publishes scheduling information. A seller can ask about records and testing before listing. A buyer can use that same information to discuss investigation deadlines before signing. Calvert County perc test guidance.

Check the well separately

Once you know what the wastewater plan requires, ask how the property will get drinking water. Water yield and drinking-water quality answer different questions. Calvert Environmental Health handles well-site evaluations, permitting and potability certificates. Ask what the parcel file shows and what will still need testing before occupancy. Calvert County private well guidance.

Put the wastewater answer on your site plan

If a neighbor has public sewer, use that as a reason to call the utility. Give them your exact parcel number and ask where a connection could be made, what work you would pay for and how to get an estimate in writing.

For septic, put the proposed house, driveway and future additions on the same drawing as the septic and reserve areas. If you hope to add a pool or detached garage later, ask about that now. Finding space for the house is only part of finding space for the way you want to use the property.

Read the video transcript

Transcript from the original recording, with light edits for readability.

0:00 Hey, it's Dawn Riley and I'm going to warn you right now, this is going to be a real crappy stinky video because we're talking public utilities and percs, perc or not to perc. I'm just going to dump all this knowledge on you about percs. If you're purchasing raw land or you're getting ready to list it for sale, the first thing you need to do is see how close you are to public sewer and water. The easiest way to do that is just to call your local public works and ask them about information about any public or community water and sewer systems. If the property is located in the city, town or next to a heavily populated area, more than likely, you already have public water and public sewer there. And the best thing about that is going to forgo the whole percolation and perc test and all the shit that's involved. Sorry, I had to do it.

0:48 So if that land does have public utilities, ask them how much it will cost to tie in your new build into their system. Sometimes you have to pay for it upfront. Sometimes you can defer it over 20 or 30 years. That's usually called a deferred utility charge or front foot fee. And the best thing about that fee is if you defer it, the next owner, let's say you sell it in 10 years, they'll be responsible for the rest of the fee. So if you don't have public utilities, you will have to do a perc test and have your own private septic system on your property. I've had one most of my life [unclear]. You’ll have to do a perc test. Now keep in mind that a perc test can only be done during the wet seasons. It is an actual test that measures the water absorptions in your soil. That perc test will actually determine what type of septic system you will need for that property.

1:35 Perks can mostly only be done during the wet season. And that means you have to get them scheduled as soon as possible. So right now it is June. Our perc season is not until December. So we can't even perc that property until December. And in our county last year, they filled up. So the people who applied last June now have to wait until this December. So actually a listing agent should actually encourage the seller of a piece of raw land to actually do this first. It's a couple hundred dollars to do the permit and to actually do the test itself. There is nothing worse than having a piece of raw land. And you have to wait a year and a half before you can even have a perc test to start the engineering on that property. In our county, you call the local environmental health department to schedule a perc test. As for a well, some areas you do have to do well test flow tests and also see if it's potable, aka drinkable, before you actually can start building.

2:30 Call your local government offices to find out more information about percs in your area. Cheers!